How to Get KEBS Certification for Bottled Water in Kenya: Step by Step

- Packaged drinking water must meet the Kenyan standard and carry the KEBS mark
- KEBS inspects the premises and tests product samples
- You also need a county business permit and public health approval
- Design the premises before you build: it saves rework
Step 1: Set up the premises
- Separate areas for raw water, treatment, filling and storage.
- Washable walls and floors, good lighting and hand-washing points.
- No toilets or waste opening directly into the filling room.
Step 2: Install proper treatment and filling

Most bottlers use sediment and carbon filtration, RO (or UF for low-TDS water), UV or ozone, a bottle washer or rinser, a filler and a sealer. See RO plant sizing and our RO stations.
Step 3: Test your water
Have product water tested by an accredited laboratory for the parameters in the standard (microbiology, TDS, pH and others) and keep the reports.
Step 4: Apply to KEBS
Apply for the Standardization Mark permit with your business registration, product details and premises information. Pay the fees KEBS sets for application, inspection and testing.
Step 5: Inspection and product testing
KEBS officers inspect the premises and processes and take samples. Fix any issues they raise and they re-inspect if needed.
Step 6: Label and stay compliant
- Print the Standardization Mark, batch number and dates on every label.
- Keep treatment and cleaning records.
- Renew the permit on time and expect surveillance visits.
Frequently asked questions
Do I need KEBS to sell bottled water?
Yes. Packaged drinking water must carry the KEBS Standardization Mark.
How long does KEBS certification take?
It depends on inspection scheduling, test results and any corrections. Plan the premises correctly to avoid delays.
Do refill shops need KEBS?
KEBS certification is for packaged products. Refill shops must meet county public health requirements; confirm the current rules with your county.
What equipment does KEBS expect?
Reliable treatment, hygienic filling and sealing, and records. The exact requirements are set by the standard and the inspection.
